Put the tasks in a rough order
List the work happening at the opening, such as flooring, wall finish, trim or painting. Ask who will confirm dimensions if the floor or wall is going to change. For each task, write down what must be complete before it can start. If two proposals assume a different order, ask each provider to explain the effect on fit and finishing.
Share useful details between trades with their permission. Include the selected threshold, the finish you want to keep or the frame area that must be left accessible. Avoid assuming one provider will talk to another unless you have arranged it. Keep clear notes about what each party has agreed to check.
- Identify who verifies final dimensions before the order.
- Flag any task that depends on finishes which are not yet selected.
- Share the current plan with the person coordinating the job.
Plan the handoff
Ask who will confirm that the previous work is complete and what the next trade needs to see. If the plan changes, share the revised scope and timing with anyone whose work depends on it.