Project and quote decisions

How to compare threshold and flooring plans

The threshold connects the doorway to the floors on either side. Both proposals need to use the same reference and the same planned finishes.

Record the existing and future levels separately

Photograph the opening from each side with the current transition visible. Note how high the threshold sits relative to each floor and whether flooring or a mat is changing. If a contractor has supplied a future floor level or finish thickness, record it separately from the current reading. Say which details are still undecided rather than adjusting the opening size yourself.

Ask each door provider to show which threshold or sill work is included. Compare if one plan keeps the existing transition and the other expects it to be replaced. Check how each proposal says the new assembly will meet the floor and who would confirm the finished result.

  • Label the reference side in each photo.
  • Name the person who will confirm the final floor height before the door is ordered.
  • Note whether a floor transition needs to be ordered separately.

Compare what still needs a decision

If you need a smoother route for everyday passage, describe that goal and let each provider assess what is appropriate. Note whether the finished floor and transition are included, another trade's work or an unresolved item.

Put two materials side by side

Compare finish, upkeep and what to check against your opening.

Compare materials