List the dates and what each one means
Record when an installer can confirm the measurements, when you would approve the exact order, when the unit is expected to arrive and when fitting could begin. Ask whether each date is confirmed, estimated or waiting for another step. A window in a schedule is easier to compare if both providers are referring to the same event.
Find out who receives and checks the unit before an installer is booked. If the project depends on room access, another trade or a deadline, share that information with both providers. Avoid arranging another job around an installation date that is only a rough estimate.
- Record one owner for each step in the timeline.
- Mark the product arrival date and the installation date separately.
- Ask which pending decisions could change when the order is placed.
Compare how each provider handles changes
Ask what happens if fitting cannot start because an item is incomplete, an estimate changes or an earlier trade needs more time. Keep the latest confirmed information with both quotes and tell those affected when the agreed timing changes.