Build a room-by-room schedule
Make a line for each opening. Add measurements and their basis, what you want to retain, and any door movement or finish you have agreed. Note hardware that applies only to one room and whether its frame needs separate inspection. Label photos with those references so the supplier does not need to guess which picture belongs to which line.
Ask each supplier to link quote items to the same references. Separate common costs, such as a shared delivery, from individual work like replacing one threshold. If a supplier groups several doors into one charge, ask which openings are included and what would change if one is delayed.
- Record any opening that needs a separate visit or another trade first.
- Keep matching finish or hardware requirements explicit across the affected rooms.
- Use a separate line for items that have not been specified.
Compare priorities and the way work is staged
Decide whether the doors should be fitted together or whether one opening needs attention sooner. Ask if that changes how the provider would order, deliver or schedule the work. Compare prices and timing using the same sequence.