Project and quote decisions

Supply only or installed door quote?

A supply-only price and an installed price describe different scopes. Compare what it takes to get the door from the listing into use.

Assign the missing steps in each proposal

For each option, say who will verify the measurements, order the exact unit, receive it and check it against the order. If the door is supplied without fitting, write down which installer will confirm suitability before you buy. Ask the installer what product and installation details they need and whether they have agreed to fit that exact unit.

Check who will provide hardware, remove the existing door and complete trim, patching or disposal. An installed proposal can still leave some of those tasks outside the scope. In a supply-only plan, find out who will be responsible for each task rather than assuming it can be added after the door arrives.

  • Name the person responsible for checking the supplied unit before work starts.
  • Record where delivery, handling and storage are included.

Compare the end condition

Decide what you expect to have when the work is finished, such as a door installed with new hardware and trim ready for paint. Put that condition beside both quotes. Ask for missing work to be identified so you can compare the two paths on the same basis.

Put two materials side by side

Compare finish, upkeep and what to check against your opening.