Project and quote decisions

Compare a slab-only project with a full-unit project

The two options change different parts of the opening. Ask both proposals to say what stays and what needs to be checked.

Compare the amount of work around the opening

In a slab-only project, the proposal should explain how the existing frame and hardware positions will be checked. A full-unit proposal should identify what needs to come out and what may happen to the trim, sill or finishes. Use a photo from each side to show what you hope to retain. Write down any parts, such as an attached side panel or unusual casing, that might change the proposed scope.

Put the same goal above both options. If the goal is easier operation, a proposal to keep the frame should say how the supplier will check whether the frame can support that result. If the goal includes changing the surrounding opening, ask what work each proposal assumes someone else will do.

  • Mark the frame and casing as keep, remove or inspect for both options.
  • Ask whether the old hardware can stay and who confirms that.

Compare the work left after fitting

Ask each provider to describe the condition of the opening after their work. Compare the remaining painting, repairs, trim and disposal as well as the unit itself. Keep any inspection-dependent changes marked as unresolved.

Put two materials side by side

Compare finish, upkeep and what to check against your opening.

Compare materials