Project and quote decisions

How to check exclusions in a door quote

Read the exclusions alongside the main quote. A missing detail may be undecided or intentionally left to you.

Find the tasks that nobody has priced yet

Look for notes on trim, flooring, painting, patching, delivery, removal and disposal. Put anything that matters to your project on a separate line. Ask whether that item is included, excluded or waiting for an assessment. If the proposal uses a broad term such as 'make good', ask what surfaces and tasks that means for this particular opening.

Ask what the provider expects to find behind the existing frame. If a different condition would change the work, find out who will explain it and when you would be asked to decide. Keep that situation separate from an item that is already known to be outside the estimate.

  • Name the person expected to arrange every excluded task.
  • Ask for the tasks that are still undecided to be called out in writing.
  • Ask what needs to be decided before the installer can start.

Compare the plans for finishing the job

For the work left outside each proposal, decide which items matter before the entrance is ready. Include the extra coordination when comparing totals. An option may still suit you if you know which tasks you are taking on.

Put two materials side by side

Compare finish, upkeep and what to check against your opening.

Compare materials